Why you'll love shopping with Anglia Market:
✓ Loyalty Program – get discount on your all-next orders.
✓ Shop with confidence – we verify every seller and offer thousands of products.
✓ Online shoppers love us – Read our Trustpilot reviews.
- All about product
- Description
- Features
- ★Verified Reviews
About this product
Discover the great outdoors with the Outsunny Portable Picnic Table Set! This three-piece set includes a spacious fold away table and two benches, great for family picnics or festival outings. Crafted with a waterproof HDPE benchtop and a corrosion-resistant metal frame, it ensures safety with joint locks and non-slip pads. Easily portable, this camping furniture unfolds adventure wherever you go!
Features:
- Three-piece set includes table and two benches for family outings
- Benchtop features waterproof, anti-fading HDPE for easy maintenance
- Powder-coated frame resists corrosion, enhances safety and stability
- Safety locks prevent accidental folding and increase stability
- Non-slip pads on legs protect floors, provide secure placement
- Easy to fold with handles for quick setup and storage
- Suitable for both indoor and outdoor use in various settings
- No assembly required
Specification:
- Colour: White, Light Grey
- Material: Metal, HDPE
- Table Dimension: 180L x 74W x 74H cm
- Chair Dimension: 182L x 28W x 42H cm
- Folding Dimension: 92L x 74W x 7H cm (table), 92L x 28W x 7.5H cm (chair)
- Tabletop Size: 180L x 74W cm
- Tabletop Height: 74 cm
- Seat Size: 182W x 28D x 42H cm
- Weight Capacity: 240 kg (chair), 50 kg (table)
- Item Label: A20-469V00WT
Package Includes:
- 1 x Table
- 2 x Chair
- 1 x Manual
Detailed Product Information
New
A brand-new, unused, unworn and undamaged item in the original packaging (such as the original box or bag) and/or with the original tags attached.
Used
An item that has been previously worn. See the seller’s listing for full details and description of any imperfections.
Refurbished
Is the distribution of products usually electronics and electricals that have been previously returned to a manufacturer or vendor for various reasons. Refurbished products are normally tested for functionality and defects before they are sold. It is repaired by a manufacturer and resold.
The main difference between "refurbished" and "used" products is that refurbished products have been tested and verified to function properly, and are thus free of defects, while "used" products may or may not be defective. Refurbished products may be unused customer returns that are essentially "new" items, or they may be defective products that were returned under warranty, and resold by the manufacturer after repairing the defects and ensuring proper function.
★Verified Reviews
No reviews found